The work breakdown structure (wbs)

 

The Work Breakdown Structure (WBS) is used in both the traditional (predictive) environment and the agile environment. The first article explains the basic WBS.

https://www.projectmanager.com/work-breakdown-structure

https://www.mpug.com/work-breakdown-structure-wbs-in-traditional-and-agile-life-cycles-with-ms-project/

The second article above explains the difference between the traditional WBS and the agile life cycle WBS. Once you understand the difference by reviewing the examples, you will create two WBS – one for the predictive cycle and one for the agile cycle – as shown in the article above. Recreate these diagrams just as you see them.

This time you’ll be creating two different kinds of Work Breakdown Structures (WBS). Perhaps you’re familiar with them? If not, this will be an opportunity to explore. Create a traditional WBS and an Agile WBS. You will see the examples in the article provided depicting a book release, now use that information and translate it to one of the following scenarios:

  • Create a new app to assist with parking availability on campus
  • Create a new job posting site for students
  • Implement a new QR code application to track and trace students from arrival to departure
  • Install self-service vending machines on campus with AI capabilities to pull food/drink off the shelf and automatically charge your school account

You’ll need to consider all of the things that would go into a project like that and start to break it up into work categories. Remember, the WBS is not a task list, it’s an outline of the various buckets of work that need to occur.

Remember to create an account at lucidchart.com (if you haven’t done so already). You can create both charts on one document – they don’t need to be separate. Share a link in the comment section of this assignment. lucidchart.com

Along with these two WBS you need to explain the commonalities and differences between the traditional WBS and the Agile WBS. 1-pager (approximately 250 words) – no APA format required







Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 10% with the coupon code: best10